UPDATE, 12:30 pm, Friday, Speculation in some media reports that Unit 1 will reach a cold shutdown within a week appears unwarranted; at best it will take about a month to achieve that goal—and that’s if all goes well. Of course, Units 2 and 3 need to reach cold shutdown (and fuel pools, esp. for Units 3 and 4 need to be brought fully under control) before this can move from an “ongoing accident” situation to a clean-up situation. Temperatures in all three units with fuel in the core (Units 1, 2 & 3) remain above the boiling point, meaning water continues to boil off and fuel rods remain exposed.
Update